In order to ensure the required quality of insulation of attic floor unit of work should be supervised at all stages of their implementation. Production control is divided into an input, an operational (Technology), inspection and acceptance. For other opinions and approaches, find out what Professor of Internet Governance has to say. Quality control of work must be carried out by specialists or special services, equipped with technical facilities, providing necessary accuracy and completeness of the control and responsibility of the Head of Production Department (superintendent, master) performing insulation work. When the device insulation must comply with the requirements in Tables 5 and 6 SNIP 3.04.01-87. Input control This control is carried out to identify deviations from project requirements and relevant standards. Input control is done by visual inspection and verification measurements, as well as routine tests in cases of doubt the correctness of the performance or lack of necessary data in the certificates and passports of the manufacturers. The results of the input controls are made by Act.
At incoming inspection should check whether the object is moving on insulation materials and products to current standards, specifications and other documents and requirements. In the absence of certificates quality of products and materials must be confirmed by laboratory testing. Number of products and materials subject to the control input must conform to the standards specified in the technical specifications and standards. Operational (process) and supervisory control Operational control is performed during the execution of manufacturing operations to ensure timely detection of defects and to take measures to their removal and prevention. Control is carried out under the guidance of the wizard, the superintendent. At the operational (technological) control should be run to verify that the main production operations thermal requirements established building codes, design the thermal insulation, and other regulations. When the operating control to be checked: – drying prepared base – the evenness plane insulation – overlaid on the surface of rail in various directions with a ruler measuring the gaps – the correctness of a given device bias – the imposition of a template – the thickness of insulation – seal the insulation layer – the layer thickness of cement-sand screed.
© 2012-2024 The National Science Fair All Rights Reserved -- Copyright notice by Blog Copyright